{"id":6624,"date":"2025-07-14T17:31:09","date_gmt":"2025-07-14T15:31:09","guid":{"rendered":"https:\/\/www.cdrpompe.com\/?p=6624"},"modified":"2025-09-17T13:02:06","modified_gmt":"2025-09-17T11:02:06","slug":"kick-off-meeting-cdr","status":"publish","type":"post","link":"https:\/\/www.cdrpompe.com\/en\/kick-off-meeting-cdr\/","title":{"rendered":"Kick-off meeting: the CDR approach for a surprise-free supply"},"content":{"rendered":"<h2><b>Summary<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Before the pump, before the designs, before production: there is a moment when every detail must be defined with absolute clarity. That moment is the kick-off meeting.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This is a structured and operational meeting that takes place immediately after order receipt, during which CDR and the client discuss and define every aspect of the order: technical configurations, documentation, certifications, witnessed tests, and logistical arrangements.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The kick-off meeting is also an opportunity to prevent any remaining ambiguities from the commercial phase and to build a shared plan for managing the supply, right up to the plant start-up. The client can participate in person or remotely, accompanied by a multidisciplinary team composed of technical, commercial, and production personnel.<\/span><\/p>\n<h2>Kick-off meeting: the CDR approach for a surprise-free supply<\/h2>\n<p><span style=\"font-weight: 400;\">Behind every supply <\/span><a href=\"https:\/\/www.cdrpompe.com\/industriale\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">industrial<\/span><\/a><span style=\"font-weight: 400;\">, <\/span><a href=\"https:\/\/www.cdrpompe.com\/chimico\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">chemistry<\/span><\/a><span style=\"font-weight: 400;\"> e <\/span><a href=\"https:\/\/www.cdrpompe.com\/farmaceutico\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">pharmaceutical<\/span><\/a><span style=\"font-weight: 400;\"> quality is something that can be seen neither in technical drawings nor in datasheets: it is a phase of listening, discussion, and coordination that defines the tone and characteristics of the entire project. This phase has a precise name, the <\/span><b>kickoff meeting<\/b><span style=\"font-weight: 400;\">.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It's more than a meeting; it's a proven work method. <\/span><b>It's the moment when the client and the team <\/b><a href=\"https:\/\/www.cdrpompe.com\/\" target=\"_blank\" rel=\"noopener\"><b>CDR<\/b><\/a><b> they sit down (physically or virtually) to verify that everything is clear, traceable, and shared<\/b><span style=\"font-weight: 400;\">Aspects such as certifications, timelines, documentation, and witnessed tests are defined once and for all before moving on to the next phase of the project, which is the physical construction of the pump and its implementation in the client's plant. It is also usually the moment when the right questions emerge, the ones that make the difference between an order executed and a project that remains only on paper.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The kick-off meeting represents <\/span><b>the initial gear of a system that works<\/b><span style=\"font-weight: 400;\">. A system built on technical precision and relationships founded on trust and concrete attention to client needs.<\/span><\/p>\n<h2><b>A decisive moment: what is the kick-off meeting<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The kick-off meeting is a structured and scheduled meeting after the order has been received., <\/span><b>in which CDR Pompe and the customer coordinate every detail of the delivery<\/b><span style=\"font-weight: 400;\">. It is the final discussion that emphasizes and clarifies what was agreed upon during the commercial phase and presents what will be concretely realized: all operational information is put on the table, expectations are clarified, and the progress of the work is planned in a shared manner.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In the process industry, every small detail counts: which is precisely why the supplier and customer meet to <\/span><b>prevent any critical issues, resolve any ambiguities that may have remained from the commercial phase and <\/b><a href=\"https:\/\/www.cdrpompe.com\/servizi-assistenza\/\" target=\"_blank\" rel=\"noopener\"><b>ensure transparency and control<\/b><\/a><b> on the entire production process<\/b><span style=\"font-weight: 400;\">.<\/span><\/p>\n<h3><b>Key elements of the supply: what is discussed in kick-off meetings<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">During the kick-off meeting, all essential elements of the project are reviewed. In addition to being a general overview of the entire project and its definitive characteristics, it is also a technical validation shared by both parties.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">The main points covered during meetings between the CDR team and clients include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Technical documentation<\/b><span style=\"font-weight: 400;\">the list and timing of submission of manuals, certificates, datasheets, assembly drawings are defined;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><a href=\"https:\/\/www.cdrpompe.com\/cdr-pompe-certificazione-aeo\/\" target=\"_blank\" rel=\"noopener\"><b>Certifications<\/b><\/a><span style=\"font-weight: 400;\">it happens that all the required regulations (e.g. <\/span><a href=\"https:\/\/tinyurl.com\/mryz6u8s\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">ATEX<\/span><\/a><span style=\"font-weight: 400;\">, PED, <\/span><a href=\"https:\/\/www.cdrpompe.com\/wp-content\/uploads\/2025\/02\/ICIM-9001-001295-08-C.D.R.-POMPE-S.R.L.-.pdf\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">ISO<\/span><\/a><span style=\"font-weight: 400;\">) have been correctly understood and programmed;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Proctored test administration<\/b><span style=\"font-weight: 400;\">Test plans, site access, and verification methods with or without third parties are planned.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">This transparent comparison ensures that <\/span><b>every element of the supply shall be known, documented, and verifiable<\/b><span style=\"font-weight: 400;\"> from the start of the works.<\/span><\/p>\n<h3><b>From initial inquiry to startup, in person or online<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The kick-off meeting is part of a broader process that begins well before delivery. In <\/span><a href=\"https:\/\/www.cdrpompe.com\/chi-siamo\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">CDR Pompe<\/span><\/a><span style=\"font-weight: 400;\"> the client is followed by <\/span><b>request for proposal up to start-up in plant, with a personalized path<\/b><span style=\"font-weight: 400;\"> and built specifically to reduce margins of error, optimize timing, and ensure continuity between departments, while also preventing valuable information from being lost between phases.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Especially in industrial settings characterized by multiple locations and often very tight deadlines, flexibility regarding scheduled meetings is necessary on both sides. For us at CDR Pompe, it is very important to accommodate our clients\u2019 needs regarding these fundamental logistical aspects. With this goal in mind, we therefore offer <\/span><b>maximum flexibility in managing kick-off meetings<\/b><span style=\"font-weight: 400;\">The meeting can take place smoothly at the CDR premises, but also directly at the client's facility or even virtually.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The important thing isn't the method, but the result: thanks to effective digital management,<\/span><b> Online meetings maintain the same structure, attention to detail, and technical presence as an in-person meeting.<\/b><\/p>\n<h2><b>A multidisciplinary team at your service<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Every CDR kick-off meeting <\/span><b>involves a coordinated working group that reflects the company's internal organization<\/b><span style=\"font-weight: 400;\">. The meeting will include, on CDR's part, the presence of <\/span><b>One<\/b> <b>referent<\/b><span style=\"font-weight: 400;\"> and of <\/span><b>a team<\/b><span style=\"font-weight: 400;\"> covering all main areas of the project: this structure ensures that every aspect of the supply is analyzed by those within the company who have the technical expertise to address it authoritatively.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Sales Office: it's<\/b><span style=\"font-weight: 400;\"> The first point of contact and ongoing reference for the client. They have a thorough understanding of the needs expressed during the offer phase and ensure consistency between initial expectations and operational execution. They coordinate communication between internal departments and the client, always maintaining an overall view of the project.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Technical office <\/b><span style=\"font-weight: 400;\">goes into detail on the configuration of the pump and accessories, verifies design feasibility, and contributes optimized engineering solutions for the specific case. It is the department that ensures the technical compliance of the supply with the required standards, adapting the project to the characteristics of the fluid or the plant if necessary.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Testing Department <\/b><span style=\"font-weight: 400;\">manages the definition of acceptance tests, both standard and custom. Manages the organization of <\/span><a href=\"https:\/\/www.cdrpompe.com\/test-presenziati-cdr\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Attended tests<\/span><\/a><span style=\"font-weight: 400;\"> and coordination with third-party entities, if applicable. It ensures that all tests are performed according to agreed-upon criteria and that results are documented completely and in compliance with current national and international regulations.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Production Department: <\/b><span style=\"font-weight: 400;\">It provides guidance on production activity planning, internal resource organization, and implementation timelines. It is the connecting point between the design and execution phases, ensuring that what was discussed in the kick-off meeting is concretely implemented on the production line.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">The client thus has direct access to a network of specialized skills working in an integrated manner. Not departments operating in silos, but a <\/span><b>Compact system that provides technical expertise, method, and responsibility<\/b><span style=\"font-weight: 400;\">.<\/span><\/p>\n<h3><b>Getting off on the right foot makes a difference.<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">During the critical early stages of the design process, industrial requires a systematic approach, clarity, and thorough preparation: the kick-off meeting is the first real, concrete step toward delivering a reliable product that fully meets all the features and specifications requested by the customer. For CDR Pompe, it is a true <\/span><b>valuable operational tool<\/b><span style=\"font-weight: 400;\">, designed above all to protect the client and give shape to a mutual commitment.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Because behind every pump supplied there is a system made of expertise and listening. And it all begins <\/span><a href=\"https:\/\/www.cdrpompe.com\/contatti\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">from here<\/span><\/a><span style=\"font-weight: 400;\">.<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>Dietro ogni fornitura industriale, chimica e farmaceutica di qualit\u00e0 c\u2019\u00e8 qualcosa che non si vede n\u00e9 nei disegni tecnici n\u00e9 nei datasheet: si tratta di una fase di ascolto, confronto e coordinamento che definisce il tono e le caratteristiche dell\u2019intero progetto. Questa fase ha un nome preciso, il kick-off meeting.<\/p>","protected":false},"author":4,"featured_media":6661,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3,71,62,73],"tags":[],"class_list":["post-6624","post","type-post","status-publish","format-standard","has-post-thumbnail","category-news","category-pompe-tenuta-meccanica","category-pompe-a-trascinamento-magnetico","category-pompe-centrifughe"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Kick\u2011off meeting CDR: inizio del progetto | CDR Pompe<\/title>\n<meta name=\"description\" content=\"Nel kick-off meeting, CDR Pompe assicura allineamento tecnico e gestione precisa di ogni fornitura industriale, senza sorprese o imprevisti\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.cdrpompe.com\/en\/kick-off-meeting-cdr\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kick\u2011off meeting CDR: inizio del progetto | CDR Pompe\" \/>\n<meta property=\"og:description\" content=\"Nel kick-off meeting, CDR Pompe assicura allineamento tecnico e gestione precisa di ogni fornitura industriale, senza sorprese o imprevisti\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cdrpompe.com\/en\/kick-off-meeting-cdr\/\" \/>\n<meta property=\"og:site_name\" content=\"CDR Pompe\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-14T15:31:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-17T11:02:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.cdrpompe.com\/wp-content\/uploads\/2025\/07\/kickoff-meeting-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"cdr-SEO\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cdr-SEO\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.cdrpompe.com\\\/kick-off-meeting-cdr\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.cdrpompe.com\\\/kick-off-meeting-cdr\\\/\"},\"author\":{\"name\":\"cdr-SEO\",\"@id\":\"https:\\\/\\\/www.cdrpompe.com\\\/#\\\/schema\\\/person\\\/e8db68b3084c8f9b1cb9bda497aceb2b\"},\"headline\":\"Kick-off meeting: l\u2019approccio CDR per una fornitura senza sorprese\",\"datePublished\":\"2025-07-14T15:31:09+00:00\",\"dateModified\":\"2025-09-17T11:02:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.cdrpompe.com\\\/kick-off-meeting-cdr\\\/\"},\"wordCount\":1162,\"image\":{\"@id\":\"https:\\\/\\\/www.cdrpompe.com\\\/kick-off-meeting-cdr\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.cdrpompe.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/kickoff-meeting-2.png\",\"articleSection\":[\"News\",\"Pompe a tenuta meccanica\",\"Pompe a trascinamento magnetico\",\"Pompe centrifughe\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.cdrpompe.com\\\/kick-off-meeting-cdr\\\/\",\"url\":\"https:\\\/\\\/www.cdrpompe.com\\\/kick-off-meeting-cdr\\\/\",\"name\":\"Kick\u2011off meeting CDR: inizio del progetto | CDR Pompe\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.cdrpompe.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.cdrpompe.com\\\/kick-off-meeting-cdr\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.cdrpompe.com\\\/kick-off-meeting-cdr\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.cdrpompe.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/kickoff-meeting-2.png\",\"datePublished\":\"2025-07-14T15:31:09+00:00\",\"dateModified\":\"2025-09-17T11:02:06+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.cdrpompe.com\\\/#\\\/schema\\\/person\\\/e8db68b3084c8f9b1cb9bda497aceb2b\"},\"description\":\"Nel kick-off meeting, CDR Pompe assicura allineamento tecnico e gestione precisa di ogni fornitura industriale, senza sorprese o imprevisti\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.cdrpompe.com\\\/kick-off-meeting-cdr\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.cdrpompe.com\\\/kick-off-meeting-cdr\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.cdrpompe.com\\\/kick-off-meeting-cdr\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.cdrpompe.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/kickoff-meeting-2.png\",\"contentUrl\":\"https:\\\/\\\/www.cdrpompe.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/kickoff-meeting-2.png\",\"width\":1024,\"height\":1024,\"caption\":\"kick-off meeting\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.cdrpompe.com\\\/kick-off-meeting-cdr\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.cdrpompe.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kick-off meeting: l\u2019approccio CDR per una fornitura senza sorprese\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.cdrpompe.com\\\/#website\",\"url\":\"https:\\\/\\\/www.cdrpompe.com\\\/\",\"name\":\"CDR Pompe\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.cdrpompe.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.cdrpompe.com\\\/#\\\/schema\\\/person\\\/e8db68b3084c8f9b1cb9bda497aceb2b\",\"name\":\"cdr-SEO\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c87423d6f8dac8c516d044ddcd1ce89667e0701144c662a55336eae4dd7fcf96?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c87423d6f8dac8c516d044ddcd1ce89667e0701144c662a55336eae4dd7fcf96?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c87423d6f8dac8c516d044ddcd1ce89667e0701144c662a55336eae4dd7fcf96?s=96&d=mm&r=g\",\"caption\":\"cdr-SEO\"},\"url\":\"https:\\\/\\\/www.cdrpompe.com\\\/en\\\/author\\\/cdr-seo\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CDR Kick-off Meeting: Project Launch | CDR Pompe","description":"At the kick-off meeting, CDR Pompe ensures technical alignment and precise management of every industrial delivery, with no surprises or unforeseen issues","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.cdrpompe.com\/en\/kick-off-meeting-cdr\/","og_locale":"en_US","og_type":"article","og_title":"Kick\u2011off meeting CDR: inizio del progetto | CDR Pompe","og_description":"Nel kick-off meeting, CDR Pompe assicura allineamento tecnico e gestione precisa di ogni fornitura industriale, senza sorprese o imprevisti","og_url":"https:\/\/www.cdrpompe.com\/en\/kick-off-meeting-cdr\/","og_site_name":"CDR Pompe","article_published_time":"2025-07-14T15:31:09+00:00","article_modified_time":"2025-09-17T11:02:06+00:00","og_image":[{"width":1024,"height":1024,"url":"https:\/\/www.cdrpompe.com\/wp-content\/uploads\/2025\/07\/kickoff-meeting-2.png","type":"image\/png"}],"author":"cdr-SEO","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cdr-SEO","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.cdrpompe.com\/kick-off-meeting-cdr\/#article","isPartOf":{"@id":"https:\/\/www.cdrpompe.com\/kick-off-meeting-cdr\/"},"author":{"name":"cdr-SEO","@id":"https:\/\/www.cdrpompe.com\/#\/schema\/person\/e8db68b3084c8f9b1cb9bda497aceb2b"},"headline":"Kick-off meeting: l\u2019approccio CDR per una fornitura senza sorprese","datePublished":"2025-07-14T15:31:09+00:00","dateModified":"2025-09-17T11:02:06+00:00","mainEntityOfPage":{"@id":"https:\/\/www.cdrpompe.com\/kick-off-meeting-cdr\/"},"wordCount":1162,"image":{"@id":"https:\/\/www.cdrpompe.com\/kick-off-meeting-cdr\/#primaryimage"},"thumbnailUrl":"https:\/\/www.cdrpompe.com\/wp-content\/uploads\/2025\/07\/kickoff-meeting-2.png","articleSection":["News","Pompe a tenuta meccanica","Pompe a trascinamento magnetico","Pompe centrifughe"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.cdrpompe.com\/kick-off-meeting-cdr\/","url":"https:\/\/www.cdrpompe.com\/kick-off-meeting-cdr\/","name":"CDR Kick-off Meeting: Project Launch | CDR Pompe","isPartOf":{"@id":"https:\/\/www.cdrpompe.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.cdrpompe.com\/kick-off-meeting-cdr\/#primaryimage"},"image":{"@id":"https:\/\/www.cdrpompe.com\/kick-off-meeting-cdr\/#primaryimage"},"thumbnailUrl":"https:\/\/www.cdrpompe.com\/wp-content\/uploads\/2025\/07\/kickoff-meeting-2.png","datePublished":"2025-07-14T15:31:09+00:00","dateModified":"2025-09-17T11:02:06+00:00","author":{"@id":"https:\/\/www.cdrpompe.com\/#\/schema\/person\/e8db68b3084c8f9b1cb9bda497aceb2b"},"description":"At the kick-off meeting, CDR Pompe ensures technical alignment and precise management of every industrial delivery, with no surprises or unforeseen issues","breadcrumb":{"@id":"https:\/\/www.cdrpompe.com\/kick-off-meeting-cdr\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.cdrpompe.com\/kick-off-meeting-cdr\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.cdrpompe.com\/kick-off-meeting-cdr\/#primaryimage","url":"https:\/\/www.cdrpompe.com\/wp-content\/uploads\/2025\/07\/kickoff-meeting-2.png","contentUrl":"https:\/\/www.cdrpompe.com\/wp-content\/uploads\/2025\/07\/kickoff-meeting-2.png","width":1024,"height":1024,"caption":"kick-off meeting"},{"@type":"BreadcrumbList","@id":"https:\/\/www.cdrpompe.com\/kick-off-meeting-cdr\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.cdrpompe.com\/"},{"@type":"ListItem","position":2,"name":"Kick-off meeting: l\u2019approccio CDR per una fornitura senza sorprese"}]},{"@type":"WebSite","@id":"https:\/\/www.cdrpompe.com\/#website","url":"https:\/\/www.cdrpompe.com\/","name":"CDR Pompe","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.cdrpompe.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.cdrpompe.com\/#\/schema\/person\/e8db68b3084c8f9b1cb9bda497aceb2b","name":"CDR-SEO","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c87423d6f8dac8c516d044ddcd1ce89667e0701144c662a55336eae4dd7fcf96?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c87423d6f8dac8c516d044ddcd1ce89667e0701144c662a55336eae4dd7fcf96?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c87423d6f8dac8c516d044ddcd1ce89667e0701144c662a55336eae4dd7fcf96?s=96&d=mm&r=g","caption":"cdr-SEO"},"url":"https:\/\/www.cdrpompe.com\/en\/author\/cdr-seo\/"}]}},"atf_populated":true,"menu_order":0,"_links":{"self":[{"href":"https:\/\/www.cdrpompe.com\/en\/wp-json\/wp\/v2\/posts\/6624","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cdrpompe.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cdrpompe.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cdrpompe.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cdrpompe.com\/en\/wp-json\/wp\/v2\/comments?post=6624"}],"version-history":[{"count":0,"href":"https:\/\/www.cdrpompe.com\/en\/wp-json\/wp\/v2\/posts\/6624\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cdrpompe.com\/en\/wp-json\/wp\/v2\/media\/6661"}],"wp:attachment":[{"href":"https:\/\/www.cdrpompe.com\/en\/wp-json\/wp\/v2\/media?parent=6624"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cdrpompe.com\/en\/wp-json\/wp\/v2\/categories?post=6624"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cdrpompe.com\/en\/wp-json\/wp\/v2\/tags?post=6624"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}